There were deteriorated flooring components visible at the deck. Depending on the severity of the deterioration, use of the deck should be cautiously monitored.
A qualified contractor should evaluate and repair or replace as necessary.

Loose board(s) were visible on the flooring at the deck.
A qualified contractor should evaluate and repair or replace as necessary.


The property had ceiling materials that may contain asbestos. Ceiling tiles or popcorn texture were manufactured or installed using asbestos as late as the early 90s.
In the past, asbestos fibers were added during the production to strengthen and increase durability. Materials that contain asbestos, when intact and in good condition, is generally considered non-friable and is not hazardous. Heat, water, weathering or aging can weaken asbestos materials to the point where it is considered friable. Friable material includes any material containing more than 1 percent asbestos that can be crumbled, pulverized or reduced to powder with hand pressure. This includes previously non-friable material which has been damaged to the extent that it may be crumbled, pulverized or reduced to powder by hand pressure and can also be made friable during its removal. Friable materials can release asbestos fibers into the air. Once in the air, asbestos fibers present a health hazard to people who inhale those fibers.

The ceiling showed wet staining indicating moisture intrusion did or does still exist. A qualified contractor should evaluate and repair or replace as necessary.

The interior walls have signs of repairs. Recommend asking the current homeowner for more information. Recommend further evaluation from a qualified contractor should the repairs be excessive or of visibly poor quality.

The stair floor squeaks when stepped on. A qualified contractor should evaluate and repair or replace as necessary.


The sink faucet or fixture needs caulking with silicone around the base. A qualified contractor should evaluate and repair or replace as necessary.

The sink faucet leaked around the control valve. A qualified contractor should evaluate and repair or replace as necessary.

The laundry room did not have an exhaust fan or an openable window. A qualified contractor should evaluate, then repair or replace as advised.

The property had ceiling materials that may contain asbestos. Ceiling tiles or popcorn texture were manufactured or installed using asbestos as late as the early 90s.
In the past, asbestos fibers were added during the production to strengthen and increase durability. Materials that contain asbestos, when intact and in good condition, is generally considered non-friable and is not hazardous. Heat, water, weathering or aging can weaken asbestos materials to the point where it is considered friable. Friable material includes any material containing more than 1 percent asbestos that can be crumbled, pulverized or reduced to powder with hand pressure. This includes previously non-friable material which has been damaged to the extent that it may be crumbled, pulverized or reduced to powder by hand pressure and can also be made friable during its removal. Friable materials can release asbestos fibers into the air. Once in the air, asbestos fibers present a health hazard to people who inhale those fibers.

The trim was missing in areas. A qualified contractor should evaluate and repair or replace as necessary.



Some caulking and/or grout in the tub & shower area was missing, loose, old, or poorly done. Recommend a qualified contractor evaluate and re-seal as needed.

The water distribution supply pipe was corroded in one or more areas. The distribution piping runs from the main source to each faucet or fixture.
A qualified contractor should evaluate and repair or replace as necessary.

The water heater was at or beyond its warranty and/or expected life expectancy.
The water heater age was determined by the photo included in this report. According to the U.S. Department of energy, these major appliances are intended to run for between 8 and 12 years. Be advised that every water heater will age differently relative to the following life span factors: water quality, mineral buildup, frequency of flushing, the volume of water utilized, size of the tank, brand, and quality of water heater. Although it was operating at the time of the inspection, the inspector can not determine the remaining life of the water heater.

The water temperature was below the suggested range of 120-130 degrees. Recommend adjusting the water heater thermostat first. If water does not reach the acceptable range then a qualified contractor should evaluate and repair or replace as necessary.

The secondary drain line was capped, missing or not routed to a drain. If the primary drain line becomes blocked, this condition could cause condensation to not drain properly and possibly damage the unit. The inspector recommends installing a secondary drain or installing an over flow protection device. A qualified contractor should evaluate then repair or replace as advised.

The HVAC system air filter was installed upside down or backwards. This condition reflects a lack of regular maintenance of the HVAC system. Improperly installed filters can restrict air flow and increase internal temperatures. A clean, properly installed air filter will help increase the efficiency and prolong the life expectancy of the heating and cooling system. Due to the damage that can be caused by dirty or clogged coils, recommend replacing filter, as well as cleaning, servicing and evaluating of the HVAC system by a qualified HVAC professional and repair or replace as necessary.

The blower motor, wheel, and/or cabinet appeared to be dirty at the time of inspection. Blower fans/wheels are subjected to constant dirt, dust, and lint and can become overly dirty when not cleaned on a regular basis and even faster if the air filters are not changed regularly.
A qualified contractor should evaluate, clean, and service as necessary, and certify the unit is in good working order.
The cooling system condenser cabinet was inaccessible. A qualified contractor should evaluate and repair/replace as necessary prior to your inspection objection deadline.